joeanderson2800 joeanderson2800
  • 25-11-2022
  • Business
contestada

binc began work on a $7,016,000 contract in 2020 to construct an office.2020 binc incurred costs of $1,798,560 billed its customers for $1,125,00 and collected $910,000.at dec 31,2020 the estimated additional costs to complete the project total $3,197,440.

Respuesta :

Otras preguntas

Jose and ling are given 50 points at the beginning of a board game,Jose lost 120 points and Ling lost 80 points. Who has fewer points? Write inquality statement
A bug walking on the circular rim of a flower pot completes one lap around the planter in 14.73 s. If the radius of the planter is 14.4 cm, how fast was it trav
plz help me on this question
Solve the following equation by COMBINING LIKE TERMS FIRST: 3x + 3 - x + 4 = 21
lisa walked 48 blocks in 3 hours how many blocks per hour ?
Introduction for sumer civilization
record the product use expanded form to help 6x 532
If I put 4,736 marbles into groups of 10, how many groups would I have
what is the emf produced in a 1.5 meter wire moving at a speed of 6.2 meters/second perpendicular to a magnetic field of strength 3.96 × 10-3 newtons/amp·meter
What is the factor of 32?