amandy8195 amandy8195
  • 24-05-2023
  • Business
contestada

Determine the production capacity achieved by an operator with a performance rating leveling factor of 90%, who worked 6.95 hours in an 8-hour shift, for time lost at 15% compensation. The standardized time of operation is 18 seconds per unit. Select one: None of the above 1440 unit 1438 units 1442 units

Respuesta :

Otras preguntas

The given line passes through the points (-4, -3) and (4, 1) What is the equation, in point-slope form, of the line that is perpendicular to the given line and
what is the difference between cv and cover letter
Find the area of the triangle ? Square units
The points (-3, 5) and (3,5) are two verticles of a square. list all other order pairs that could be the other two verticles of the square.
1. Identify the region of the state that you live in and how the geographic features or resources of your region impact the role your region plays in Washington
importance of sports and games essay of100 words​
what was america’s involvement in d-day?
help me now please thanks
HELP ME OUT PLEASE KISSES WILL BE AWARDED
If A(4 -6) B(3 -2) and C (5 2) are the vertices of a triangle ABC fine the length of the median AD from A to BC. Also verify that area of triangle ABD = Area of