nalzaga23 nalzaga23
  • 24-02-2020
  • Business
contestada

the person or group most responsible for a product meeting?

Respuesta :

aaliyahlowe71
aaliyahlowe71 aaliyahlowe71
  • 24-02-2020

Answer:

The people most responsible for a product meeting are both the participant and the leader. This is because the participant has the great responsibility of choosing the product, appreciating every detail and contemplating the commercial potential.

Explanation:

Answer Link
nathanamerida
nathanamerida nathanamerida
  • 14-09-2020

Answer:

both the leader and the participants APEX VERIFIED

Explanation:

Answer Link

Otras preguntas

Is it possible for a number to be a rational number that is not an integer but is a whole number? PLEASE EXPLAIN
What is 13.48 rounded to the nearest 10th
Consider function F(x)=4x^2+5 find value of f(X) if X=2
What is -1.35 as a fraction
What does citizenship have to do with voting
3/5p-4=25 plz... help me
A square patio has an area of 200 square feet how long is each side to the nearest 0.05
What law provided for a 40-hour work week? A. Consumer Credit Protection B. Sherman Antitrust Act C. Pure Food and Drug Act D. Fair Labor Standards Act
The Green revolution was meant to a. strengthen ties between Pakistan and Bangladesh c. turn India into an industrial nation b. bring Muslims and Hindus togethe
Which statement is true? a. –16+23 = –17+10 b. 15+(–5) > 23+(–12) c. 8+(–7) < –15+14 d. –12+(–11) > 5+(–29)