mayedabaig12
mayedabaig12 mayedabaig12
  • 23-07-2020
  • Mathematics
contestada

It takes 4 people 2 days to paint a wall. How long would it take if we got 8 people to do it?

Respuesta :

MyNameZach MyNameZach
  • 23-07-2020

Answer:

if it takes 4 people for 2 days

4+4= 8

so it would only take 8 people for 1 day

Answer Link
S1NGH
S1NGH S1NGH
  • 23-07-2020

Answer:

1 day

Step-by-step explanation:

4 people = 2 days

→ Work out how long 1 person takes

4 people = 2 days

( ÷ 4 )            ( × 4 )

1 person = 8 days

→ Work out how long 8 people can do it

1 person = 8 days

( × 8 )            ( ÷ 8 )

8 people = 1 day

Answer Link

Otras preguntas

Excerpt from "The Bells"by Edgar Allan PoeHear the sledges with the bellsSilver bellsWhat a world of merriment their melody foretells!How they tinkle, tinkle, t
Please answer this question
A rectangle is formed by placing two identical squares side by side The area of one square is 4 cm What is the perimeter of the entire rectangle?
b) How much mg can the child receive per dose? A: 531.82 mg
What is the math problem ? 5x+17=2
Please answer i need it now please
T/F: Elimination is using multiplication and division to eliminate one variable and solve a system of equations. *
What was one manufacturing success in the south ?
Select the verb form that correctly completes the conversation. Carlos: Marta, ¿vos ___________ qué está pasando? Marta: Protestan debido a los problemas en la
Maria invests $6,154 in a savings account with a fixed annual interest rate of 8% compounded continuously. What will the account balance be after 10 years?