treysksa treysksa
  • 23-02-2022
  • French
contestada

The first step in a risk management program is to
A. Measure the frequency and severity of potential losses.
B. Monitor the results of the program.
C. Identify the risks and potential losses.
D. Evaluate the alternatives.

Respuesta :

christianangellight
christianangellight christianangellight
  • 23-02-2022
C. Identify the risks and potential losses.
Answer Link

Otras preguntas

Which event is associated with the peripeteia in the play?
Oversteepened slopes often lead to mass movements because A. the angle of their slope is between 50 and 60 degrees. B. plants cannot grow on them. C. the angl
What is the connection between witchcraft and communism
4 bags of cement do 18m2 how many m2 can be done with 7 bags
The four main Allies in World War I were _____. Spain Austria-Hungary England France United States China Russia
What is 2/5 of 500? Please help
Given: Q = 7m + 3n, R = 11 - 2m, S = n + 5, and T = -m - 3n + 8. Simplify R - [S + T].
what are the three classical leaf patterns
The small boat was scudding into the open sea with a full sail. a. getting stuck b. sinking deeply c. moving swiftly d. rocking harshly
why did gunning bedford want the states to have equal representation?