If 10 men can complete a piece of work in 30 days how many men are requiredto complete the same job in 25 days?

Respuesta :

AL2006
AL2006 AL2006
  • 22-07-2014
We must assume that all workmen work at the same rate, and keep it up forever.

More men ==> fewer days

so the proportion is:    30/25 = x/10

Cross-multiply the proportion:

300 = 25 x

Divide each side by 25 :

x = 300/25 = 12 men
Answer Link

Otras preguntas

The median price, P, of a home rose from $50 thousand in 1980 to $150 thousand in 2000. Let t be the number of years since 1980. If instead the housing prices i
Which structure or organelle is found in both prokaryotic and eukaryotic cells?
What was discovered in 1848 that caused settlers to rush to california? a. oil b. silver c. gold d. diamonds user: what were california gold seekers commonl
Pure sugar is an example of a(n):
Monica and her friends had 6/8 of an apple pie left. The 8 friends decided to cut up the leftover pie. If they all had am equal piece, howuch pie did each of th
The united states constitution does not permit citizens to protest or challenge the rule of government. true false
Find the limit as x approaches 0. 1-cos3x/sin3x.
t < 49 Let t = the amount Thomas earned. Thomas earned $49 or more. t ≤ 49 t ≥ 49 t > 49 t < 49
Find the y intercept of the lines. -10x + 5y = 40 5x + 4y = 80
A highway on-ramp rises 15 feet for every 100 horizontal feet traveled. What is the slope of the ramp?